How Many BBS Bore Bumpers Do You Need for a Bundled HDD Pull?

Need pricing, availability, or help with your application?
Steve Simpson — Joint Specialists Inc.

Phone: 936-321-3333
Email: steve@jsicoatings.com
Website: www.heatshrinksleeves.com

“We need 24 bumpers.” That sounds like enough information to start an order—until you find out there are three pipes in the bundle.

For a bundled HDD pull, count the complete bumper assemblies required on each pipe. A location along the bundle and a BBS assembly are not necessarily the same thing.

Installed BBS assembly showing the raised trapezoidal bumper profile

What is the BBS system protecting?

JSI developed BBS to keep pipelines from rubbing and colliding with one another during bundled directional drilling. The bumper creates separation. The epoxy, heat-shrink holder, and leading-edge protection work together to keep that bumper assembly in place through the pull.

That is the value of a complete system: the rubber provides the cushion, while the attachment has to survive the forces trying to move it.

A simple quantity example

Suppose the approved arrangement calls for one BBS assembly on each of three pipes at 24 positions along the bundle:

3 pipes × 24 approved positions = 72 BBS assemblies.

This is a counting example, not a spacing recommendation. If the approved layout calls for different positions or a different assembly arrangement on one pipe, count that pipe separately. The end user’s requirements determine placement.

Group the order by pipe size

A bundle with mixed pipe diameters needs more than a single total. List each coated outside diameter, the number of assemblies required on that line, and the applicable configuration. Include field-joint build-up and the proposed bundle arrangement.

This helps us supply the right sleeve and bumper components for each part of the job. It also helps the field crew separate the materials instead of sorting an undifferentiated pile beside the bore.

Include the parts that hold the bumper in place

The BBS booklet describes the system’s bumper material, S1301M epoxy, main heat-shrink, and leading-edge strip. An order based only on rubber footage misses the components that make it a functioning bore bumper system.

Epoxy requirements should also follow the actual assembly sizes and application plan. One primer kit may serve more than one installation; that is a coverage calculation, not a reason to assume one epoxy kit per rubber piece.

Proven in a demanding pull

Our four-pipe bundled bore case study describes a project with two 16-inch lines, a 12-inch line, and a 10-inch line. A pull-head problem gave the project team an unusual opportunity to inspect the installed bumpers after the bundle had entered and been withdrawn from the bore.

For your project, send the pipe sizes, bundle drawing, approved bumper locations, and required delivery date. My contact details are at the top.