A bore through rocky ground can subject a pipeline coating to a very different experience than ordinary trench construction. The Rocky River project in North Carolina shows why the mechanical-protection plan deserves attention before the pipe is ready to pull.
Canusa’s ScarGuard brochure describes a 2,400-foot crossing using 30-inch outside-diameter gas pipe installed by HDD.

Protecting the field-joint coating during the pull
The project used HBE-95 field-joint coating. ScarGuard was selected over it to provide additional mechanical protection during the demanding pull.
The field-joint coating provided the underlying corrosion protection. The fiber-reinforced ScarGuard composite added protection against the abrasion and other mechanical damage associated with installation.
Why this crossing used four layers
The brochure describes ScarGuard as typically applied in a two-layer system. Rocky River used a four-layer configuration because of the rocky terrain, difficult drilling conditions, pipe size, and tight construction window.
Those details matter. The assembly was selected for the crossing rather than assuming one configuration belongs on every bore.
What this means for an upcoming HDD job
Include the soil conditions, underlying coating, pipe size, and installation method in the early discussion. A field-joint coating can be suitable for corrosion service and still need added protection during pullback.
The selected coverage and layer configuration also affect the roll quantity and the crew’s application sequence. Including them in the estimate helps avoid a last-minute shortage when the pull is approaching.
Put the case study to work
The documented selection at Rocky River is useful evidence for a product discussion. It does not mean every rocky crossing needs four layers or establish a universal pullback guarantee.
Read the ScarGuard brochure and project summary, then send JSI your crossing information. We can discuss product documentation, material requirements, and availability for the proposed assembly.
My contact details are at the top. Include the field-joint coating and expected bore conditions with your inquiry.
Joint Specialists Inc. — Providing pipeline corrosion prevention solutions since 1995.