Visit our website: www.jsicoatings.com
Call: (936) 321-3333
Email: steve@jsicoatings.com

Thursday, May 30, 2013

How Long After Install Can the Shrink Sleeve Hit the Stinger?

Question:  How long do I have to wait on an offshore pipeline installation (S-Lay) before the shrink sleeve can contact the stinger?

Answer:  The only real stipulation is that the sleeve must be cooled to ambient temperatures.  Many times an sea water quenching system is put in place to cool the sleeve within seconds. 

No comments:

Post a Comment