Visit our website: www.jsicoatings.com
Call: (936) 321-3333
Email: steve@jsicoatings.com
Showing posts with label dual pipe pullback. Show all posts
Showing posts with label dual pipe pullback. Show all posts

Sunday, March 10, 2024

Press Release: BBS (Bundle Bore Sleeves) Near 100,000 Successful Installs

 FOR IMMEDIATE RELEASE

 

JSI’s HDD Bundle Spacers (BBS) Closing in on 100,000 Installs Milestone, Launches New Website, and Embarks on Innovative Product Improvement Exploration

 

[Conroe, TX - March 18, 2024] – JSI celebrates approaching 100,000 successful installations of BBS, a revolutionary solution for multi-pipe pullbacks and bundled directional drilling applications.  JSI (Joint Specialists), a renowned provider of innovative solutions for pipeline construction and coating, proudly announces a significant achievement for its flagship product, Bundled Bore Spacers (BBS).  With immense appreciation for its loyal customers and industry partners.

In conjunction with this milestone, JSI is excited to unveil the launch of BBS’s new website:  HDDBundle.com – designed to offer a smooth user experience and easy accessibility, the newly launched website serves as a comprehensive platform for customers to explore BBS’s range of products, access valuable resources and stay informed about the latest advancements in this and JSI’s other products (Powercrete and Covalence).  This launch underscores JSI’s unwavering commitment to providing exceptional support and service to its valued clientele. 

Furthermore, JSI is pleased to announce the launch of a research and development program to evaluate new materials and sizing options for the bumpers that will be innovatively tailored to maximize field efficiency and streamline the application process even more than it currently is. 

“We are thrilled to celebrate this milestone achievement of reaching 100,000 installations of BBS products,” stated Steve Simpson of JSI.  “This accomplishment is a testament to the dedication of our team and the enduring support of our clients and partners in the industry.  As we continue to innovate and expand our product offerings, we are excited to embark on this new exploration of ways to make the BBS product even better.  We firmly believe that the coming advancements will further solidify BBS’s position as the leading solution for protecting pipe involved in bundles in the pipeline construction and HDD industry.”

With a rich legacy of innovation and a steadfast commitment to excellence, JSI remains at the forefront of pipeline construction and coating technology; driving progress and shaping the future of the industry.  Looking ahead, the company remains resolute in its mission to deliver superior quality, performance and reliability to all of our clients.

For more information about JSI and its flagship product BBS, please visit the new website:  www.HDDBundle.com

About JSI (Joint Specialists):  Established in 1995, JSI is a leading provider of innovative coatings and solutions for pipeline construction.  JSI sets the industry standard for service, fast turnarounds and excellent technical advice. 

 

Conroe, TX March 17, 2024


Tuesday, February 20, 2024

BBS Bumper for Bundled Bores - Included Components

 BBS Bumpers for Pipe Bundles - What is Included?

     Sometimes called Multi-Pipe Pullbacks; bundled road bores occur when more than one pipe is pulled through a bore hole.  It is a new tweak on a long time technology; the only difference is:  the bore hole is large enough to fit more than one pipeline.  In those cases, two things have to be considered:

  1.   How do we make sure they pipelines don't damage one another during the pull through?  Pipes do jolt at times as they encounter rock, roots, etc.  You certainly don't want those lines that you are never going to see again experiencing damage to their corrosion coatings!
  2.   How do we make sure we don't have pipelines resting upon one another?  We've supplied bumpers on bundles with as many as 11 pipelines involved.  Imagine 11 pipeline all resting on one another (picture a handful of uncooked spaghetti).  How is CP going to get to the line that is stuck in the middle of that bundle surrounded by a literal pipe wall keeping soil, water and current away from the line?  How about the "inside" sides of those pipes that are making up the "wall"?  You need to make sure there is space between those pipelines so that soil can ultimately fill those areas; creating a path for the CP. 
If you're curious - you can see a case study HERE.

     Now with nearly one hundred thousand bumpers installed and pulled through bore holes; we've yet to hear of a single bumper failure.  Yet to hear of a single bumper that disappeared during transit (the bumpers on the leading edge of the bundle always show up on the other end of the bore).   We've got a proven product, using our specially formulated bumper material --- and our proven system for making certain the bumper stays in place.  Many other folks have used this product successfully; so you can be confident you aren't taking any chances at all.

     So what comes in the system? See below:

rubber pipe bumper
Our specially formulated bumper material.  We are also working on new shapes to offer some advantages in the field.  Hopefully those evaluations will be completed in the months to come!


epoxy bonding agent
The epoxy bonding agent that gives fantastic shear and peel resistance to the bumper holding system.



BBS/CCS
The main component that holds the bumper in place with nowhere to go.  Tens of thousands installed with no reported failures.


pipe Rubber
Finally, the leading edge strip.  Probably not needed in all honesty, but this, installed on the leading edge of the system gives even more protection against some kind of peel back.